Wavy pattern with short rows and garter carriage
https://jitkaswelt.blogspot.de/2017/10/wellenmuster-in-verkurzten-reihen.html
14 st pattern repeat + 2
left side garter carriage, right side knitting carriage.
72 st
cast on with garter carriage and knit 4 rows garter, push carriage on left extension
knitting carriage on right, H
whole waves:
13 needles on right in B, all others on left in E
move carriage to left, wrap, 4 needles on right in hold and knit to right
wrap, 1 needle opposite carriage to hold, knit to left.
1 needle opposite carriage to hold, knit to right, 7 needles remain in working
add 15 needles to left and knit over all 22 st to left, push 13 needles on right side to hold that 9 st remain in working
**** knit to right, 1 needle left side in hold, knit to left, 1 needle right side to hole, knit to right, 7 needles remain, add 15 needles to left and knit all 22 st to left, 13 needles on right to E (9 st remaining) and knit to right
repeat from ****
finish to the left, last row over all needles to right, then with garter carriage 4 rows in garter st.
half waves:
start with 6 needles in work, all other in E position. knit to left, knit to right, left needle in hold (5 remaining) knit to left then right, add 15 needles to left and knit to left, on right side put needles in hold that 9 needles are left in working position, then continue like for the whole waves
last 18 st to left, the last half wave on left side.
all needles in E except 6 on left side, knit to right, knit to left, 1 needle on right to hold, knit to right, then left, then over all needles to right and 4 rows with garter carriage.
Always wrap on carriage side.
14 st pattern repeat + 2
left side garter carriage, right side knitting carriage.
72 st
cast on with garter carriage and knit 4 rows garter, push carriage on left extension
knitting carriage on right, H
whole waves:
13 needles on right in B, all others on left in E
move carriage to left, wrap, 4 needles on right in hold and knit to right
wrap, 1 needle opposite carriage to hold, knit to left.
1 needle opposite carriage to hold, knit to right, 7 needles remain in working
add 15 needles to left and knit over all 22 st to left, push 13 needles on right side to hold that 9 st remain in working
**** knit to right, 1 needle left side in hold, knit to left, 1 needle right side to hole, knit to right, 7 needles remain, add 15 needles to left and knit all 22 st to left, 13 needles on right to E (9 st remaining) and knit to right
repeat from ****
finish to the left, last row over all needles to right, then with garter carriage 4 rows in garter st.
half waves:
start with 6 needles in work, all other in E position. knit to left, knit to right, left needle in hold (5 remaining) knit to left then right, add 15 needles to left and knit to left, on right side put needles in hold that 9 needles are left in working position, then continue like for the whole waves
last 18 st to left, the last half wave on left side.
all needles in E except 6 on left side, knit to right, knit to left, 1 needle on right to hold, knit to right, then left, then over all needles to right and 4 rows with garter carriage.
Always wrap on carriage side.